Lifecycle Feasibility Study
Client: Industrial production facility with aging heat pump system
Challenge: Should they invest in a repair (£28k) or replace the system (£50k)?
Our Approach:
- Surveyed system condition and reliability history (Gathered from CAFM)
- Calculated efficiency deltas between old vs. modern units
- Collected warranty periods and service intervals for both options
- Calculated energy and running cost forecasts over 5 years
Outcome:
- Replacement would reduce monthly energy usage by 22%
- Manufacturer warranty + maintenance bundle lowered exposure
- Payback < 3 years versus repair
Result: Client opted for a full system replacement, which we helped specify and procure. Delivering savings and long-term resilience.